Dinarte Construction & Consulting
  • Home
  • Contact Us
  • Services
  • Gallery
  • Testimonials
  • More
    • Home
    • Contact Us
    • Services
    • Gallery
    • Testimonials
  • Sign In
  • Create Account

  • Bookings
  • My Account
  • Signed in as:

  • filler@godaddy.com


  • Bookings
  • My Account
  • Sign out

Dinarte Construction & Consulting

Signed in as:

filler@godaddy.com

  • Home
  • Contact Us
  • Services
  • Gallery
  • Testimonials

Account


  • Bookings
  • My Account
  • Sign out


  • Sign In
  • Bookings
  • My Account

Rapid HR L6 Smart Sensors ASTM F2170

Concrete Relative Humidity Testing

Dinarte construction & Consulting provides one of the most important steps prior to the installation of any floor covering or coating.

Relative humidity testing utilizing the latest in technology and accuracy.

Rapi RH L6 smart sensors provide an accurate understanding of amount of relative humidity within the concrete slab within a 24 hour period.  The smart sensors comply with all ASTM F2170 standards providing results within a 24 hour period.

Calcium Chloride moisture testing ASTM F1869

Calcium Chloride Testing

The Calcium Chloride test provides one of the most important steps prior to the installation of any floor covering or coating.

The test provides an accurate understanding of the amount of vapor emissions (measured in pound ) escaping from the surface of the concrete slabs. 

The metho is used to obtain a quantitative value indicating the rate of moisture vapor emission from the surface of the concrete subfloor and whether or not the floor is acceptable to receive resilient floor coverings. 

No Project is too small

Pre-Construction

 This first phase entails monitoring budgets, managing timely delivery schedules, and collaborating with design teams to bring your vision to life—all with constant communication. 

Construction

 We partner with trusted subcontractors, ensuring accountability and quality at every stage—from sequencing to production—while keeping the end goal in sight. 

Post-Construction

 The final phase includes site cleanup, systems training, inspections, and move-in coordination, followed by a walkthrough to guarantee your satisfaction.  

Trades

Parklet Builds

Framing

Iron Railing/Fencing/Gates

Concrete

Drywall

Plumbing

Cabinetry

Floor Coverings

Countertops

Interior & Exterior Paint

Insulation

Appliance Installation



Services

Property Damage Assessments

Construction Management

Commercial & Residential Maintenance/Remodels 

Restoration Estimates

Exterior work (Stucco/Paint)

Patio Installation (Aluminum/Wood)

  Restorations following fire, water, mold, or flood damage. 


Concrete Moisture Assessments 

(Calcium Chloride & Internal Relative 

Humidity Testing)  

 A detailed report outlining the concrete conditions prior to floor covering installation will be provided. 




Dinarte Construction Consulting #1010698

909.758.1625

Copyright © 2024 Dinarte Construction Consulting - All Rights Reserved.

Powered by GoDaddy

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept